Improving Silver Creek’s Pheasant Run Trail

The Operations Department of Summit Metro Parks is responsible for maintaining all trails within the park district and consistently updates a list of necessary improvements. In June 2023, the Pheasant Run Trail at Silver Creek received a substantial enhancement with the addition of 565 tons of crushed gravel covering the entire length of the trail.

A bridge was also installed to create a loop connector over a creek near one of the trail’s ponds.